Flow battery pack with monitoring system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9640816
SERIAL NO

14382642

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a flow battery pack with a monitoring system. The flow battery pack with a monitoring system comprises a battery pack device and a monitoring device. The battery pack device comprises a pole plate, and the pole plate is provided thereon with a measuring port. The monitoring device comprises a measuring probe, and the measuring probe extends to the interior of the battery pack device and is arranged corresponding to the measuring port on the pole plate. The monitoring device is used for monitoring the flow pressure and temperature at the measuring port. According to the technical solution of the present disclosure, a monitoring device is introduced into the interior of a flow battery pack, and the real values of correlative parameters of the interior of the battery pack and the distribution status thereof can be obtained through the monitoring device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DONGFANG ELECTRIC (CHENGDU) HYDROGEN FUEL CELL TECHNOLOGY CO LTD610097 NO 18 XIXIN AVENUE CHENGDU HIGH-TECH ZONE SICHUAN PROVINCE CHENGDU CITY SICHUAN PROVINCE 610097

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lian, Yong Sichuan, CN 7 40
Tang, Hao Sichuan, CN 366 1753
Wang, Ronggui Sichuan, CN 2 6
Xie, Guangyou Sichuan, CN 2 3
Yin, Cong Sichuan, CN 10 12
Zhang, Zhankui Sichuan, CN 3 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00