Method for producing bulk silicon carbide by sublimation of a silicon carbide precursor prepared from silicon and carbon particles or particulate silicon carbide

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10633762
APP PUB NO 20150068447A1
SERIAL NO

14478512

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing silicon carbide is disclosed. The method comprises the steps of providing a sublimation furnace comprising a furnace shell, at least one heating element positioned outside the furnace shell, and a hot zone positioned inside the furnace shell surrounded by insulation. The hot zone comprises a crucible with a silicon carbide precursor positioned in the lower region and a silicon carbide seed positioned in the upper region. The hot zone is heated to sublimate the silicon carbide precursor, forming silicon carbide on the bottom surface of the silicon carbide seed. Also disclosed is the sublimation furnace to produce the silicon carbide as well as the resulting silicon carbide material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GTAT CORPORATION243 DANIEL WEBSTER HIGHWAY MERRIMACK NH 03054

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Andrukhiv, Andriy M Hollis, US 9 24
Drachev, Roman V Bedford, US 9 24
Lyttle, David S Amherst, US 9 24
Santhanaraghavan, Parthasarathy Nashua, US 8 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 28, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 28, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00