Field development plan selection system, method and program product

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10689965
APP PUB NO 20150058274A1
SERIAL NO

14299770

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system, method and computer program product for assessing field development plans selected based on a stochastic response surface, preferably, for hydrocarbon reservoir production. Assessment begins by assessing uncertainty associated with multiple decision variable configurations. A subset of realizations is selected. An individual surrogate is constructed for each subset realization. A reduced representative realization subset is determined, where the reduced subset is representative of the behavior/performance of all realizations of decision variable configurations.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERNATIONAL BUSINESS MACHINES CORPORATIONNEW ORCHARD ROAD ARMONK NY 10504

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ciaurri, David Echeverria Manhattan, US 5 14
Embid, Droz Sonia Mariette Madrid, ES 9 25
Flach, Bruno da Costa Copacabana, BR 8 47
Hegazy, Mohamed Ahmed Heliopolis Cairo, EG 9 39
Mello, Ulisses T Blauvelt, US 14 70
Rodriguez, Torrado Ruben Madrid, ES 6 18
Valladao, Davi Sao Paulo, BR 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 23, 2027
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 23, 2031
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00