Base substrate which prevents burrs generated during the cutting process and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9913381
APP PUB NO 20150049447A1
SERIAL NO

14460587

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A base substrate which prevents burrs generated during the cutting process includes: multiple conductive layers stacked in one direction with respect to the base substrate; at least one insulation layer being alternately stacked with said conductive layers and electrically separating said conductive layers; and a through-hole penetrating said base substrate covering said insulation layer at the contact region where said cut surface and said insulation layer meet during the cutting of said base substrate in accordance with a predetermined region of the chip substrate. A method of manufacturing the base substrate includes alternately stacking conductive layers and insulation layers and forming a through-hole.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
POINT ENGINEERING CO LTD89 ASANVALLEY-RO DUNPO-MYEON ASAN-SI CHUNGCHEONGNAM-DO 31409

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ahn, Bum Mo Yongin-si, KR 162 241
Park, Seung Ho Hwaseong-si, KR 185 355
Yun, Kyoung Ja Cheonan-si, KR 3 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00