Airflow control and heat recovery in a managed kiln

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9752078
APP PUB NO 20150040804A1
SERIAL NO

14384351

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A controlled kiln and manufacturing system for biochar production includes control systems and subsystems. An example controlled kiln (100) includes a drum (200), a lid (120) and a floor (250) together forming a combustion chamber configured to contain feedstock for conversion into biochar. A catalytic converter (700) may be operatively coupled with an outlet of the kiln (100). A monitor and control subsystem may be operative to issue notifications or automatically end biochar conversion. A ventilation and exhaust system including independently controllable air inlet ports (240), a chimney (300) and smoke inlet pipes (330) enables regulation of smoke flow from a combustion chamber of the kiln while a heat exchanger (1000) enables providing exhaust heat to one or more secondary applications.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BIOCHAR NOW LLC2409 LAKE DRIVE LOVELAND CO 80538

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aupperle, Donald P Seattle, US 25 354
Beierwaltes, Benjamin M Longmont, US 8 124
Beierwaltes, William T Loveland, US 20 280
Gaspard,, II James G Loveland, US 17 216
Olander, Mikel S Johnstown, US 8 124

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00