Laser light source with reduced beam combination operation for projection display

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10197896
APP PUB NO 20150002823A1
SERIAL NO

14485580

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In one aspect, a light source for a projection display includes: three laser light sources, a beam combining lens, and a phosphor wheel coated with phosphor powders. Each of the first and second laser light sources outputs a first light beam and a second light beams respectively, which are respectively reflected by the beam combining lens. The third laser light source outputs a third light beam, which is projected onto the phosphor powders of the phosphor wheel. The phosphor wheel is excited by the third light beam to output a fourth light beam such that the fourth light beam is projected onto the beam combining lens. The beam combining lens reflects the first and second light beams, and transmits the fourth light beam therethrough.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HISENSE USA CORPORATION7310 MCGINNIS FERRY ROAD SUWANEE GA 30024
HISENSE CO LTDDONGHAI WEST ROAD 266071 SHANDONG CITY OF QINGDAO PROVINCE NO 17 QINGDAO CITY SHANDONG PROVINCE 266071

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Yan, Guofeng Shandong, CN 3 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Aug 5, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 5, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00