Method and system for impact pressure generation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9863225
APP PUB NO 20150000917A1
SERIAL NO

14366648

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for the recovery of hydrocarbon from a reservoir includes arranging a chamber in fluid communication with the reservoir via at least one conduit. The chamber includes first and second wall parts movable relative to each other. An impact pressure is provided in the fluid to propagate to the reservoir via the conduit, where the impact pressure is generated by a collision process between an object arranged outside of the fluid and the first wall parts for the first wall part to impact on the fluid in the chamber. The chamber is arranged to avoid a build-up of gas-inclusions where the first wall part impacts on the fluid. This may be obtained by arranging the conduit in or adjacent to the zone where the gas-inclusions naturally gather by influence of the gravitational forces, or by placing the first wall part impacting on the fluid away from this zone.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IMPACT TECHNOLOGY SYSTEMS ASFILIPSTAD BRYGGE 1 OSLO N-0252

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Paulsen, Jim-Viktor Drammen, NO 6 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jul 9, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 9, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00