Reciprocating compressors having timing valves and related methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10711776
APP PUB NO 20140377081A1
SERIAL NO

14367109

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A reciprocating compressor for the oil and gas industry, the reciprocating compressor has a chamber, a timing valve, an actuator and a controller. A fluid entering the chamber via a suction valve is compressed inside the chamber, and evacuated from the chamber via a discharge valve. The timing valve is located between the chamber and a fluid volume at a relief pressure that is lower than a pressure in the chamber when the timing valve is opened. The actuator is configured to actuate the timing valve. The controller is configured to control the actuator such that to open the timing valve during an expansion phase of the compression cycle, and to close the timing valve when the relief pressure becomes equal to the pressure in the chamber or when the suction valve is opened.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NUOVO PIGNONE TECNOLOGIE S R LITALY FLORENCE FIRENZE FLORENCE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bagagli, Riccardo Florence, IT 24 119
Tognarelli, Leonardo Florence, IT 42 232

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 14, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 14, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00