Truly modular building datacenter facility

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9603281
APP PUB NO 20140352231A1
SERIAL NO

14463474

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A modular datacenter facility is constructed with a set of building modules of different types of functionality to form an entire datacenter facility having a standardized pre-approved architectural design and layout. All instances of a particular type of building module will have approximately a same floor plan and architectural design. An initial set of building modules can be built upon a parcel of land, and then as needs of space and additional capacity of the modular datacenter facility increase, then at a future point in time additional building modules of the different types can be rapidly added to the initial set of building modules. The building modules of the different types use one or more connecting corridors architected into at least a first type of building module and corresponding aligned doorways between both building modules to interconnect two building modules adjacent and abutted to each other.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COMPASS DATACENTERS LLC14180 N DALLAS PARKWAY SUITE 610 DALLAS TX 75254

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Crosby,, Jr Christopher J Dallas, US 9 122

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 21, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00