Fuel cell mechanical components

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10840535
APP PUB NO 20140342252A1
SERIAL NO

14447944

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A modular fuel cell system includes a base, at least four power modules arranged in a row on the base, and a fuel processing module and power conditioning module arranged on at least one end of the row on the base. Each power module includes a separate cabinet which contains at least one fuel cell stack located in a hot box. The power modules are electrically and fluidly connected to the at least one fuel processing and power conditioning modules through the base.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BLOOM ENERGY CORPORATIONSUNNYVALE CA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ballantine, Arne Palo Alto, US 151 1210
Clarabut, Alex Sunnyvale, US 8 54
Hixson, Jason San Jose, US 6 56
Lee, Michael Vancouver, US 318 18987
Mahler, Jessica Mountain View, US 22 161
Mitlitsky, Fred Livermore, US 26 1081
Parker, Ross Santa Clara, US 11 98
Pearson, Chad Mountain View, US 22 414
Richards, Gilbert San Jose, US 13 115
Trevisan, David San Jose, US 15 166
Weingaertner, David Sunnyvale, US 80 630

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 May 17, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 17, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00