Rotary engine and process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9638035
APP PUB NO 20140325986A1
SERIAL NO

14356952

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention is a rotary engine comprised of at least one and usually a plurality of independent partial engines. Two different processes can be carried out in each independent partial engine both of which are used to operate the engines. The processes of the invention are basically two different and separate closed cycle processes that can both operate within the same geometric confinement, i.e. the same expansion chamber or expansion chambers, at the same time. The primary process performs the main function of converting heat to kinetic energy and is necessary in all engines of the invention. It is a unique process that uses the expansion of gases and also the contraction of the condensing gases after their expansion. The secondary process is needed for start-up and to provide additional power in case the engine might go into a stall. In most engines of the invention both processes are needed to operate the engine.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TRIPLE E POWER LTD49 HACHSHARAT HAYISHUV STREET BE'ER SHEVA 8487037

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zettner, Michael Gan-Yavne, IL 5 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 2, 2024
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 2, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00