Long cycle life lithium sulfur electrochemical cells

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9923234
SERIAL NO

14260918

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A sulfur-based cathode for use in an electrochemical cell is disclosed. The sulfur is sequestered to the cathode to enhance cycle lifetime for the cathode and the cell. An exemplary sulfur-based cathode is coupled with a solid polymer electrolyte instead of a conventional liquid electrolyte. The dry, solid polymer electrolyte further acts as a diffusion barrier for the sulfur. Together with a sequestering matrix in the cathode, the solid polymer electrolyte prevents sulfur capacity fade that occurs in conventional liquid electrolyte based sulfur systems. The sequestering polymer in the cathode further binds the sulfur-containing active particles, preventing sulfur agglomerates from forming, while still allowing lithium ions to be transported between the anode and cathode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEEO INC3906 TRUST WAY HAYWARD CA 94545

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eitouni, Hany Basam Oakland, US 78 813
Singh, Mohit Berkeley, US 68 1574

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 20, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 20, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00