Methods and apparatus for selectively combining particulate material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10933581
APP PUB NO 20140314613A1
SERIAL NO

14237160

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of selectively combining particulate material, comprising: (i) providing a layer of particulate material to a part bed; (ii) providing radiation to sinter a portion of the material of the layer; (iii) providing a further layer of particulate material overlying the prior layer of particulate material including the previously sintered portion of material; (iv) providing radiation to sinter a further portion of the material within the overlying further layer and to sinter said further portion with the previously sintered portion of material in the prior layer; (v) successively repeating blocks (iii) and (iv) to form a three-dimensional object; and wherein at least some of the layers of particulate material are pre-heated with a heater prior to sintering a portion of the material of the respective layer, the heater being configured to move relative to, and proximate, the particulate material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LOUGHBOROUGH UNIVERSITYLOUGHBOROUGH LEICESTERSHIRE LE11 3TU

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hopkinson, Neil Sheffield, GB 9 290
Thomas, Helen Rhiannon Nottingham, GB 2 50

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 2, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 2, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00