Compensation current sensor arrangement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9804203
SERIAL NO

14258217

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The current sensor arrangement according to the compensation principle has a primary conductor, designed to generate a primary magnetic field dependent on a current to be measured flowing through it, a first secondary winding, designed to generate a first secondary magnetic field dependent on a first compensation current flowing through said winding, a second secondary winding designed to generate a second secondary magnetic field dependent on a second compensation current flowing through said winding, a magnetic field sensor designed to generate a measurement signal that represents a magnetic field detected by it; a magnetic core of soft magnetic material designed and arranged to magnetically interconnect a primary conductor, a first seconding winding, a second secondary winding, and a magnetic field sensor; a first evaluation circuit, downstream from the magnetic field sensor and upstream from the first secondary winding, and a second evaluation circuit, upstream from the second secondary winding.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VACUUMSCHMELZE GMBH & CO KGGRUENER WEG 37 HANAU 63450

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lenhard, Friedrich Hanau, DE 14 126

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 30, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 30, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00