Controller for a common-rail injection system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9850842
SERIAL NO

14256638

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A controller for a common-rail injection system includes a plurality of fuel injectors, a common fuel supply line for the fuel injectors, a high-pressure pump for supplying the common fuel supply line with fuel, and a pressure sensor for determining the pressure in the common fuel supply line. A determination unit evaluates data of the pressure sensor and, from the pressure drop caused by an injection in the common fuel supply line, determines the fuel quantity actually injected during this injection or a value derived therefrom. An adaption unit uses the results of the determination unit in order to adapt the actuation of the fuel injectors. The determination unit carries out at least one test injection, and the actually injected fuel quantity or a value derived therefrom is effected by way of the test injection or injections.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LIEBHERR-COMPONENTS DEGGENDORF GMBH94469 DEGGENDORF

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Christ, Konrad Bulle, CH 3 28
Masson, Francois Villars-sur-Glane, CH 12 34
Pirkl, Richard Bulle, CH 53 290

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00