Methods and systems for infrastructure-monitoring control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10712735
APP PUB NO 20140303751A1
SERIAL NO

14206505

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and systems for infrastructure-monitoring control are provided. An example method for providing a visual representation of system events occurring in a system monitored by an infrastructure-monitoring control system includes the infrastructure-monitoring control system providing, in substantially real-time, a visual representation of at least one system event occurring in the system, wherein the visual representation comprises a color-coded visual representation depicting the at least one system event throughout the system. The method further includes the infrastructure-monitoring control system storing the visual representation. Still further, the method includes the infrastructure-monitoring control system then providing the visual representation after a given amount of time since the at least one system event.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ASCO POWER TECHNOLOGIES L P50 HANOVER ROAD FLORHAM PARK NJ 07932

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ibrahim, Mario Summit, US 12 24
Sylvester, Dan Mountain Lakes, US 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 14, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 14, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00