Forklift

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10023451
APP PUB NO 20140241840A1
SERIAL NO

14347971

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A forklift includes a forklift body having a front wheel and a rear wheel, a fork supported to the front of the forklift body so as to be capable of moving vertically via a mast, a lift cylinder capable of moving the fork up and down, a hydraulic pressure supply line capable of supplying hydraulic pressure to a head-side chamber in the lift cylinder, a hydraulic pressure exhaust line capable of exhausting hydraulic pressure from a rod-side chamber in the lift cylinder, and a changeover valve provided on the hydraulic pressure exhaust line, wherein a control device changes a pressure balance between hydraulic pressure on the head-side chamber and hydraulic pressure on the rod-side chamber in the lift cylinder by the changeover valve to restrict the operation of the lift cylinder, when a weight of a load on the fork exceeds a limit load weight.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI NICHIYU FORKLIFT CO LTD1-1 2-CHOME HIGASHIKOTARI NAGAOKAKYO-SHI KYOTO 617-8585

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Futahashi, Kensuke Tokyo, JP 40 164
Hashimoto, Naohito Tokyo, JP 1 3
Kawaguchi, Masataka Tokyo, JP 13 124
Tsuruta, Megumu Tokyo, JP 16 33

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 17, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 17, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00