Apparatus and method for adjusting display characteristics of display device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9911371
SERIAL NO

14157415

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A display panel driver includes an image data generator, a brightness correction circuit performing a correction calculation on image data, a drive section driving the display panel in response to corrected image data; and a display timing generator outputting a timing control signal. The correction calculation by the brightness correction circuit is adjustable. When the display panel driver is placed into a test mode, the display timing generator is configured to output an internally-generated timing control signal and the image data generator outputs internally-generated evaluation image data. The evaluation image data are generated so that the evaluation images are switched from one to another in response to the internally-generated timing control signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SYNAPTICS INCORPORATED1109 MCKAY DRIVE SAN JOSE CA 95131-1706

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Furihata, Hirobumi Tokyo, JP 128 848
Nose, Takashi Tokyo, JP 171 1594
Sugiyama, Akio Tokyo, JP 39 241

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 6, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 6, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00