FUEL INJECTION APPARATUS
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Jul 24, 2014
app pub date -
Jan 10, 2014
filing date -
Jan 21, 2013
priority date (Note) -
Abandoned
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A control unit obtains approximation straight lines before and during the fuel injection with respect to a first injection and a second injection among multiple fuel injections based on a pressure variation in the fuel accumulator which is sampled by the pressure sensor. The control unit employs data of which correlation coefficient is higher among a pilot injection and a main injection and obtains a hypothetical injection-start point accurately. Based on the variation amount of the hypothetical injection start delay which is obtained from the hypothetical injection-start point, an energization-start timing and the target-energization period are corrected.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
DENSO CORPORATION | KARIYA-CITY AICHI 448-8661 |
International Classification(s)

- 2014 Application Filing Year
- F02D Class
- 1473 Applications Filed
- 1318 Patents Issued To-Date
- 89.48 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
KATSURA, Ryou | Anjo-city, JP | 5 | 24 |
# of filed Patents : 5 Total Citations : 24 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 2 Citation Count
- F02D Class
- 5.62 % this patent is cited more than
- 11 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jan 24, 2026 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
