Kit and method for indirect chairside production of composite inlays

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9833387
SERIAL NO

14047406

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a kit for indirect production of composite inlays, comprising a polymerizable material for production of a dental model, a polymerizable material for production of an inlay, a polymerizable material for luting of a crosslinked and non-sand-blasted, non-silanized, non-etched, non-primed and non-roughened composite inlay, the surfaces of which have been fully polymerized, in the cavity. Also disclosed is a polymerizable material for increasing the bond strength between the polymerizable material for luting of a crosslinked non-sand-blasted, non-silanized, non-etched, non-primed and non-roughened composite inlay, the surfaces of which have been fully polymerized, in the cavity, and the hard substance of the tooth, and an acid solution for surface etching of the hard substance of the tooth. The invention further relates to methods for producing a composite inlay.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VOCO GMBH27472 CUXHAVEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bloemker, Tobias Hamburg, DE 3 7
Hoffmann, Klaus-Peter Cuxhaven, DE 8 32
Plaumann, Manfred Thomas Cuxhaven, DE 47 324
Willner, Alexander Cuxhaven, DE 3 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 5, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 5, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00