Plant graft production line

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9504206
APP PUB NO 20140109471A1
SERIAL NO

14115144

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A plant graft production line for automatically grafting a rootstock and a scion si disclosed. The aforesaid plant graft production line comprises (a) a closed-loop conveyor; (b) at least one grafting assembly arranged for transporting along said conveyor; the assembly further comprises a rootstock holder for holding the rootstock and a scion holder for holding the scion; the holders arranged for at least partially superimposing said rootstock and scion; (c) stationary cutting mechanism for cutting exposed rootstock surface; (d) a stationary cutting mechanism for cutting a exposed scion surface to be; (e) stationary clipping mechanism for clipping the superimposed rootstock and scion together. It is a core feature of the invention to provide the rootstock holder arranged so as to provide a curvilinear plane along which said rootstock is conformed thereby presenting a curved cutting target for the cutting mechanism.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LUGO ENGINEERING DEVELOPMENT LTDP O BOX 160 TALMEI YAFFE D N HOF ASHKELON 79120
HISHTIL LTD49950 MOSHAV NEHALIM

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Luk, Ofir Moshav Neve Mivtah, IL 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 29, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00