Internal combustion engines and oil containment systems thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9347345
APP PUB NO 20140096737A1
SERIAL NO

13645753

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An internal combustion engine includes an engine assembly and an oil containment system attachable to the assembly. The oil containment system includes a cover component including an oil fill apparatus configured for conducting an oil to the internal combustion engine. The apparatus has a first end sealable with a cap, a second end spaced apart from the first end along a central longitudinal axis, and an annular wall concentric with and extending along the central longitudinal axis. The annular wall defines a first passage therethrough and a channel extending through the cover component along the central longitudinal axis. The oil containment system also includes a baffle component abutting the second end and defining a second passage therethrough such that the second passage is spaced apart from the channel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GM GLOBAL TECHNOLOGY OPERATIONS LLCP O BOX 300 MAIL CODE 482-C23-B21 DETROIT MI 48265-3000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nelander, Christopher Paul West Bloomfield, US 4 7
Spix, Thomas A Rochester Hills, US 33 152

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 24, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00