Cycle press

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10011084
SERIAL NO

14117051

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a cycle press, in particular a short-cycle press, for producing and/or coating board-shaped materials, in particular engineered wood boards, comprising a press body having several press frames arranged next to one another in the longitudinal press direction, and further comprising an upper press plate and a lower press plate, wherein pressing cylinders supported on the press frames act on the upper press plate or the lower press plate. According to the invention, said cycle press is characterized in that the pressing cylinders are attached to the press frames by means of frame pins, wherein said frame pins engage in cut-outs of the press frames. Thus, the pressing cylinders can be prestressed against the press frames.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMPELKAMP MASCHINEN-UND ANLAGENBAU GMBH&CO KGSIEMPELKAMPSTRASSE 75 KREFELD D-47803

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Schuermann, Klaus Juechen, DE 7 19
Sebastian, Lothar Duisburg, DE 30 96
Weiss, Horst Wachtendonk, DE 45 378

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 3, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 3, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00