Method and device for producing a composite fiber material in the form of a fiber strip impregnated with a polymer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9334607
APP PUB NO 20140050862A1
SERIAL NO

14004270

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device for producing a composite fiber material in the form of a fiber band impregnated with a polymer includes a transport device for supplying and for transporting a fiber band along a processing path. To preheat the raw fiber band to a processing temperature a preheating device is used. An application device is used for applying the melted polymer on the whole width onto the surface of the raw fiber band. At least one pressure shearing vibration application device is used to apply pressure to the raw fiber band perpendicular to the band plane after the application of the polymer, where the application of pressure is performed by at least one pressure stamp with the simultaneous shearing vibration of the pressure stamp by a vibration movement component (y) in the band plane and transversely to a band running direction. At least one tempering device is used to keep the raw fiber band within a processing temperature range. This results in a production method and a production device with a predefined impregnating quality at the lowest possible production cost.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COVESTRO THERMOPLAST COMPOSITE GMBH91477 MARKT BIBART

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Börger, Herbert Langenfeld, DE 6 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 10, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00