Down-sampling clock and data recovery circuit having selectable rate and phase output and method of operation thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8971718
APP PUB NO 20130322885A1
SERIAL NO

13486552

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A clock and data recovery (CDR) circuit, a method of recovering a clock and data from a received raw data stream and a BI-PON optical network transceiver (ONT) receiver front-end incorporating the CDR circuit. In one embodiment, the CDR circuit includes: (1) a line rate CDR circuit having a voltage controlled oscillator, the line rate CDR circuit configured to recover a raw data stream at a receiving line rate, (2) a fixed-rate down-sampler coupled to the line rate CDR circuit and configured to down-sample the raw data stream based on a fixed-rate and (3) a variable-rate down-sampler coupled to the fixed-rate down-sampler and configured further to down-sample the raw data sample based on a variable-rate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALCATEL LUCENT148/152 ROUTE DE LA REINE BOULOGNE-BILLANCOURT 92100

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chow, Hungkei Livingston, US 11 54
Li, Zhisheng Ghent, BE 28 94
Suvakovic, Dusan Pleasanton, US 26 332
Torfs, Guy Ghent, BE 11 29
Van, Praet Christophe Ghent, BE 2 5
Yin, Xin Ghent, BE 33 101

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 3, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00