Integrated start-up bias boost for dynamic error vector magnitude enhancement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9118281
SERIAL NO

13897192

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Devices and methods for correcting for start-up transients in integrated power amplifiers are disclosed. A delay element is arranged to produce a delay waveform signal that is responsive to an input voltage signal. A transconductance element has an input that receives the delay waveform signal and is arranged to provide an output boost current that is based on the delay waveform signal and a gain of the transconductance element. A reference element provides an output bias current that is responsive to a static reference current and the boost current. A bias element has an input that receives the bias current and is arranged to provide a bias control output. A power amplifier is responsive to the bias control output and is arranged to provide an amplified power output. In some examples, the boost current is adjusted based on a supply voltage and an input power of the power amplifier.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MICROSEMI CORPORATION11861 WESTERN AVE GARDEN GROVE CA 92841

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eplett, Brian Lilburn, US 4 20
Hershberger, Kyle Marietta, US 3 27
Santini, Mark Atlanta, US 6 60

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 25, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00