Relay valve control arrangement to provide variable response timing on full applications

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9002610
APP PUB NO 20130151105A1
SERIAL NO

13315640

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A brake system and related components including a metering device are configured to regulate a control signal received from a brake control device such that a control valve delays the supply of a level of requested braking pressure for a prescribed amount of time. The metering device can be an inversion valve and orificed check valve in a control circuit adapted to allow relatively unrestricted flow until a threshold pressure is reached, after which pressure the inversion valve closes and the flow is metered through an orifice. This has the effect of allowing rapid brake actuation to a first level, and then slowing further application of the brake until full requested braking is achieved. An electronic control unit can also be configured to regulate a control signal to delay development of the requested brake pressure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BENDIX COMMERCIAL VEHICLE SYSTEMS LLC35500 CHESTER ROAD AVON OH 44011

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eberling, Charles E Wellington, US 46 427
Hamar, James M Strongsville, US 2 3
Ramler, Travis G Elyria, US 22 93
Ripley, John V Elyria, US 14 66

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 7, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00