Storage of intermittent renewable energy as fuel using carbon containing feedstock

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9249064
APP PUB NO 20130137783A1
SERIAL NO

13510729

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and system for converting intermittent renewable energy and renewable carbonaceous feedstock to non-intermittent renewable electrical and thermal energy, storing it as fuels and chemicals and using it to capture and re-use or dispose of CO2 emissions. The system in a preferred embodiment is realized through the generation of non-intermittent renewable electricity utilizing intermittent renewable energy sources along with gaseous fuel from renewable carbonaceous feedstock, producing oxygen and hydrogen from non-intermittent renewable electricity and utilizing the oxygen and hydrogen as required for gasification of renewable carbonaceous feedstock to produce gaseous fuel stream and gaseous intermediate stream, utilizing the gaseous intermediate stream to produce renewable fuels and renewable chemicals, and utilizing oxygen for oxy-rich combustion for concentrating CO2 emissions for easy processing, re-use and disposal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CRI, EHF

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alexander, Kathleen Corvallis, US 8 36
Kumar, Challapalli Naga Kiran Satyanarayanapuram, IN 1 17
Sigurbjornsson, Omar Freyr Reykjavik, IS 2 29
Tran, Kim-Chinh Gardabaer, IS 7 113
Whitlow, Jonathan Melbourne Beach, US 6 19

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 2, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00