Connecting an inverter in a solar power plant with shifted potential center point

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8804390
APP PUB NO 20130121029A1
SERIAL NO

13671914

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a process of connecting an AC output of a transformerless inverter of a solar power plant to an internal AC power grid at an input side of a galvanic isolation, while an offset voltage for shifting a potential center point of a photovoltaic generator connected to the inverter is applied. The process includes: (i) synchronizing the inverter with the power grid; (ii) essentially matching a potential center point of the current-carrying lines of the AC output and a potential center point of the power grid, while only one of the potential center points of the current-carrying lines and the power grid is yet shifted by the offset voltage; and (iii) galvanically connecting all current-carrying lines of the AC output with the power grid only after the steps of synchronizing and essentially matching.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SMA SOLAR TECHNOLOGY AG34266 NIESTETAL

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Coors, Stephanie Knuellwald, DE 3 19
Mueller, Tobias Escherode, DE 49 177
Prior, Oliver Marsberg, DE 17 429

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 12, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00