METHOD OF CONTROLLING THE FINISHING OF OPERATION OF A DRYING FURNACE ASSEMBLY IN A FOOD WASTE DISPOSER
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Mar 21, 2013
app pub date -
May 12, 2011
filing date -
May 12, 2010
priority date (Note) -
Abandoned
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A method of finishing the operation of a heating unit based either on a temperature difference between a drying furnace temperature and a recycling gas duct temperature or on a temperature difference between an exhaust gas duct temperature and a recycling gas duct temperature instead of finishing the operation of the heating unit based only on the drying furnace temperature.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
WOONGJIN COWAY CO LTD | GONGJU-SI |
International Classification(s)

- 2011 Application Filing Year
- F26B Class
- 274 Applications Filed
- 210 Patents Issued To-Date
- 76.65 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Jee, Sang Jun | Seoul, KR | 3 | 3 |
# of filed Patents : 3 Total Citations : 3 | |||
Park, Chan Jung | Seoul, KR | 35 | 151 |
# of filed Patents : 35 Total Citations : 151 | |||
Shin, Tae Seok | Seoul, KR | 2 | 0 |
# of filed Patents : 2 Total Citations : 0 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- F26B Class
- 0 % this patent is cited more than
- 12 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
