Process for a continuous production of polyetherols

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8957257
APP PUB NO 20130023700A1
SERIAL NO

13551936

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for a continuous production of a polyetherol first involves reacting a catalyst (5) with an alcohol starter (3) or an alkoxylated precursor, to give a mixture comprising an alcoholate and water. Water is then removed from the mixture. The process further involves feeding the alcoholate into a bubble column and feeding an alkylene oxide into the bottom of a compartment of the bubble column, such that the alkylene oxide rises in the alcoholate. The alkylene oxide then reacts with the alcoholate or a secondary product from the reaction between the alcoholate and alkylene oxide, to give the polyetherol.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BASF SELUDWIGSHAFEN AM RHEIN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adelmann, Ronald Darmstadt, DE 2 4
Admadnian, Fatemeh Ludwigshafen, DE 1 0
Bey, Oliver Niederkirchen, DE 47 150
Bohling, Ralf Lorsch, DE 13 83
Brodhagen, Andreas Tiefenthal, DE 24 420
Chilekar, Vinit Tervuren, BE 10 18
Grossmann, Christoph Grunstadt, DE 15 233
Joshi, Milind Ludwigshafen, DE 12 64
Kammel, Ulrich Kapellen, BE 6 82
Loffler, Achim Speyer, DE 6 27
Meckelnburg, Dirk Limburgerhof, DE 17 46
Ostrowski, Thomas Mannheim, DE 31 162
Waters, Gerrit Karlsruhe, DE 15 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 17, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00