Refrigeration cycle apparatus and operating method of same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9222706
APP PUB NO 20120318001A1
SERIAL NO

13581477

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A refrigeration cycle apparatus achieves efficient operation by constantly recovering power in a wide operating range. The refrigeration cycle apparatus regulates a pressure of a high pressure side by changing either one or both of an opening degree of the intermediate-pressure bypass valve and an opening degree of the pre-expansion valve on the basis of a density ratio that is obtained from an inflow refrigerant density of the expander and an inflow refrigerant density of the sub-compressor in an actual operating state and a design volume ratio that has been expected at the time of design and that is obtained from a stroke volume of the sub-compressor, a stroke volume of the expander, and a ratio of a flow rate of the refrigerant flowing to the sub-compressor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATIONTOKYO 100-8310

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hatomura, Takeshi Tokyo, JP 69 568
Kakuda, Masayuki Tokyo, JP 42 371
Nagata, Hideaki Tokyo, JP 17 532
Shimazu, Yusuke Tokyo, JP 51 418
Takayama, Keisuke Tokyo, JP 49 366

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 29, 2027
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00