Solar cell assembly I

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10333015
APP PUB NO 20120298202A1
SERIAL NO

13575277

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a solar cell assembly, comprising a solar cell attached to a bonding pad and a cooling substrate and wherein the bonding pad and the cooling substrate are joined to each other in a planar and flush manner such that the bonding pad and the cooling substrate are connected to each other in the form of a solid state connection. The invention further relates to a solar cell assembly that includes a solar cell attached to a bonding pad and a cooling substrate and wherein the bonding pad is attached on a surface of the cooling substrate such that the bonding pad and the cooling substrate are connected to each other in the form of a solid state connection. Also, a method for manufacture of such solar cell assemblies is provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAINT-AUGUSTIN CANADA ELECTRIC INC75 RUE D'ANVERS SAINT-AUGUSTIN QUEBEC G3A 1S5

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Van, Riesen Sascha Freiburg, DE 7 19
Ziegler, Martin Freiburg, DE 19 161

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2026
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2030
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00