Running gear frame for a running gear of a rail vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8813654
APP PUB NO 20120234201A1
SERIAL NO

13220875

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A running gear frame for a rail vehicle includes a central transverse beam, and two longitudinal beams connected together in a frame transverse direction via the transverse beam, wherein the transverse beam has at least a front web element, a rear web element and a transverse beam lower chord. The web elements run between the longitudinal beams in the frame transverse direction and in a frame height direction and are connected therewith and are arranged spaced apart in a frame longitudinal direction. The transverse beam lower chord extends on an underside of the transverse beam between the longitudinal beams and is connected with the web elements. Furthermore, the transverse beam lower chord extends beyond the front web element and/or the rear web element by at least 10% of the web element distance.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BOMBARDIER TRANSPORTATION GMBHBERLIN GERMANY BERLIN BERLIN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Geiger, Igor Krueztal, DE 4 4
Gier, Paul Aachen, DE 5 5
Kwitniewski, Matthias Aachen, DE 4 4
Müller, Detlef Seigen, DE 8 7
Mannsbarth, Heiko Wiesbaden, DE 4 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 26, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00