Nuclear Power Facility
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
N/A
app pub date -
Feb 6, 2012
filing date -
Feb 8, 2011
priority date (Note) -
Published
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A nuclear island includes at least one nuclear reactor. A turbine island includes at least a turbine building housing at least one turbine driven by steam generated by the nuclear reactor. A protected area has a perimeter protected by at least one fence. An isolation zone surrounds the protected area and includes intrusion detection devices configured to detect unauthorized approach toward the protected area. The nuclear island is disposed inside the protected area, and the turbine island is disposed outside of and spaced apart from the protected area.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
BWXT MPOWER INC | 11525 N COMMUNITY HOUSE RD SUITE 600 CHARLOTTE NC 28277 |
International Classification(s)

- 2012 Application Filing Year
- G21C Class
- 228 Applications Filed
- 214 Patents Issued To-Date
- 93.86 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Noel, James L | Monroe, US | 1 | 3 |
# of filed Patents : 1 Total Citations : 3 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 3 Citation Count
- G21C Class
- 16.22 % this patent is cited more than
- 13 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
