Cyclonic burner with separation plate in the combustion chamber

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9046263
APP PUB NO 20120148964A1
SERIAL NO

13261143

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and apparatus for burning fuel are described In a conventional boiler the combustion process produces particles which form a layer of deposits on boiler tubes, thus reducing heat transfer efficiency A fuel burner (100) includes a casing, a combustion chamber (106), a tangential gas inlet (108), a fuel delivery system (112) and an exhaust port (114) The casing includes a lower wall (102), an upper wall (104) and a cylindrical side wall (105) formed between the lower and upper walls (102, 104) and encloses the combustion chamber (106) The tangential gas inlet (108) is formed in the cylindrical wall (105) of the combustion chamber (106) The fuel delivery system (112) is configured to deliver fuel into the tangential air inlet (108) The exhaust port (114) is formed in the upper wall (104) of the combustion chamber (106) Gas is delivered into the combustion chamber (106) at a velocity and flow rate and mixes with fuel delivered from the fuel delivery system (112), such that a clean flame burns in the combustion chamber (106) A clean flame is a flame substantially free of unburned particulate matter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HAYNES HAROLDNot Provided

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Haynes, Harold Airdrie, CA 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 2, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00