FIBER OPTIC LOAD MEASUREMENT DEVICE
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
May 31, 2012
app pub date -
Oct 19, 2011
filing date -
Oct 19, 2010
priority date (Note) -
Abandoned
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A measurement device may include a loadable member that supports a load and measures the force created in the loadable member by the load. The loadable member may have an aperture and an optical fiber located within the aperture. The optical fiber may include one or more fiber Bragg grating (FBG) sensors.
First Claim
all claims..Other Claims data not available
Family
- No Family data available.
- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
CLEVELAND ELECTRIC LABORATORIES CO | 1776 ENTERPRISE PARKWAY TWINSBURG OH 44087 |
International Classification(s)

- 2011 Application Filing Year
- G01L Class
- 708 Applications Filed
- 559 Patents Issued To-Date
- 78.96 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
McNeilly, Michael | Gilbert, US | 7 | 97 |
# of filed Patents : 7 Total Citations : 97 | |||
Way, Donald R | Scottsdale, US | 5 | 65 |
# of filed Patents : 5 Total Citations : 65 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 9 Citation Count
- G01L Class
- 5.59 % this patent is cited more than
- 13 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
