Method for producing assembled battery and assembled battery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8546011
APP PUB NO 20120114995A1
SERIAL NO

13057653

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing an assembled battery, comprising the following steps: (a) producing a plurality of unit cells; (b) arranging the plurality of unit cells in a nested manner such that one unit cell is disposed within another unit cell; and (c) electrically connecting the plurality of unit cells with one another in parallel or in series. The problem that toroidal batteries with high capacity, high power density and small thickness may have a large volume and low energy density is solved by connecting in parallel a plurality of unit cells nested within one another, and heat dissipation of the battery is also further improved. An assembled battery produced by the method is also provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TSINGHUA UNIVERSITY100084 NO 1 TSINGHUA YUAN BEIJING HAIDIAN DISTRICT BEIJING CITY BEIJING CITY 100084
BEIJING HUA CHUANG HONG LI ENERGY TECHNOLOGIES LTDNO 1 SHUN QIANG STREET SHUN YI DISTRICT BEIJING 101300

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
An, Jie Beijing, CN 8 23
Qiu, Xinping Beijing, CN 3 16
Zheng, Xi Beijing, CN 20 66
Zhu, Wentao Beijing, CN 62 283

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00