Method for determining a commutation offset and for determining a compensation map for a stage

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9465305
APP PUB NO 20120113405A1
SERIAL NO

13101264

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for determining a commutation offset for a mover (250A) of a mover assembly (220C) that moves and positions a stage (220A) relative to a stage base (220B) includes controlling the mover assembly (220C) in a closed loop fashion to maintain the position of the stage (220A) along a first axis and along a second axis with the stage (220A) levitated above the stage base (220B). The method also includes the steps of (i) directing current to a coil array (240) of the mover assembly (220C) so that the mover assembly (220C) imparts a disturbance on the stage (220A); and (ii) evaluating one or more forces generated by the mover assembly (220C) as a result of the disturbance on the stage (220A) created by the mover (250A). Further, a method for generating a compensation map (1402) includes sequentially directing a plurality of excitation signals to the control of the mover assembly (220C) and determining the control commands that result from the plurality of excitation signals.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIKON CORPORATIONTOKYO 108-6290

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Binnard, Michael B Belmont, US 64 610
Coakley, Scott Belmont, US 28 260
Hirano, Kazuhiro Ageo, JP 16 243
Koo, Shiang-Lung Fremont, US 5 58
Yang, Pai-Hsueh Palo Alto, US 30 226
Yuan, Bausan San Jose, US 63 682

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 11, 2028
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00