Projection lens arrangement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8445869
APP PUB NO 20120091358A1
SERIAL NO

12905126

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a charged particle multi-beamlet system for exposing a target using a plurality of beamlets. The system has a charged particle source, an aperture array, a beamlet manipulator, a beamlet blanker, and an array of projection lens systems. The charged particle source is configured to generate a charged particle beam. The aperture array is configured to define separate beamlets from the generated beam. The beamlet manipulator is configured to converge groups of the beamlets towards a common point of convergence for each group. The beamlet blanker is configured to controllably blank beamlets in the groups of beamlets. Finally, the array of projection lens systems is configured to project unblanked beamlets of the groups of beamlets on to the surface of the target. The beamlet manipulator is further adapted to converge each of the groups of beamlets towards a point corresponding to one of the projection lens systems.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ASML NETHERLANDS B VP O BOX 324 VELDHOVEN 5500 AH

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Van, Veen Alexander Hendrik Vincent Rotterdam, NL 30 314
Wieland, Marco Jan-Jaco Delft, NL 104 1084

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 21, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00