Elements for signal and/or power transmission into or to cabin components

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8800922
SERIAL NO

13181623

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The description covers cabin components for aircraft, which can be produced with a sandwich structure and may have the components 1003 for signal and/or power transmission. The cabin components in this case have at least two prepreg layers 1001, 1005 and, for example, a honeycomb layer 1002, which can be connected to one another by pressing and heating. Furthermore, electrical and/or optical signal paths are shown on cabin components, which can be produced by positioning them there or printing. In addition, according to the description, signal and/or power transmission can take place beyond the boundary of cabin components, by means of a transmitter/receiver path.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DIEHL AVIATION LAUPHEIM GMBH88471 LAUPHEIM

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Grabmann, Jürgen Nürnberg, DE 2 11
Klingseis, Markus Biberach, DE 5 23
Knopp, Norbert Leinburg, DE 3 14
Kuhnla, Wolf-Dieter Kaisheim-Leitheim, DE 3 14
Pätzold, Ralph Roth, DE 5 9
Renz, Marc Schwabach, DE 5 20
Schevardo, Dirk-Achim Röthenbach, DE 13 53
Schmid, Frank Poppenricht, DE 36 105
Völkle, Dietmar Biberach, DE 5 18
Younes, Peter Höchstadt a. d. Aisch, DE 2 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 12, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00