Biomass processing system and saccharide-solution production method using biomass material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9850511
SERIAL NO

13203929

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydrothermal decomposition apparatus 17 as a biomass processing apparatus that decomposes a biomass material 11 into cellulose, hemicellulose, and lignin under a high temperature and high pressure condition to remove a lignin component and a hemicellulose component, a biomass solid discharging unit 18 that discharges a biomass solid (a hot-water insoluble component) 20 processed in the hydrothermal decomposition apparatus 17, and a slurrying vessel 21 communicating with the biomass solid discharging unit 18, into which water 19 is injected and the discharged biomass solid 20 is added to make it slurried are provided to an apparatus body 13, which is a processing vessel having a gas-liquid interface 13a.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI POWER ENVIRONMENTAL SOLUTIONS LTD1-8 SAKURAGI-CHO 1-CHOME NAKA-KU YOKOHAMA-SHI KANAGAWA 231-0062

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kimura, Yoshitaka Tokyo, JP 82 631
Kuromi, Yoshio Tokyo, JP 4 24
Suzuki, Hideo Tokyo, JP 375 5761

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Jun 26, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 26, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00