Nucleotide sequences and corresponding polypeptides conferring modulated plant growth rate and biomass in plants

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 9914935
SERIAL NO

12911698

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to isolated nucleic acid molecules and their corresponding encoded polypeptides able confer the trait of modulated plant size, vegetative growth, organ number, plant architecture, growth rate, seedling vigor, growth rate, fruit and seed yield, tillering and/or biomass in plants. The present invention further relates to the use of these nucleic acid molecules and polypeptides in making transgenic plants, plant cells, plant materials or seeds of a plant having plant size, vegetative growth, organ number, plant architecture, growth rate, seedling vigor and/or biomass that are altered with respect to wild type plants grown under similar conditions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CERES, INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alexandrov, Nickolai Thousand Oaks, US 104 1396
Brover, Vyacheslav Simi Valley, US 90 1593
Christensen, Cory Simi Valley, US 43 284
Feldmann, Kenneth Newbury Park, US 75 483
Mascia, Peter Thousand Oaks, US 29 653
Nadzan, Greg Woodland Hills, US 12 203

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Sep 13, 2025
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 13, 2029
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00