Process for the preparation of fischer-tropsche catalysts and their use

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8841229
APP PUB NO 20110301024A1
SERIAL NO

13201715

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for preparing a catalyst precursor includes, in a first preparation step, impregnating a particulate catalyst support with an organic metal compound in a carrier liquid. The metal of the organic metal compound is an active catalyst component. An impregnated intermediate is formed, and is calcined to obtain a calcined intermediate. Thereafter, in a second preparation step, the calcined intermediate from the first preparation step is impregnated with an inorganic metal salt in a carrier liquid. The metal of the inorganic metal salt is an active catalyst component. An impregnated support is obtained, and is calcined, to obtain the catalyst precursor. The metal is in particular cobalt. The precursor is reduced, in particular with hydrogen, to obtain the active catalyst. Also claimed is a process for the hydrogenation of CO, as well as a process for the hydrogenation of an organic compound using the so-prepared catalyst.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SASOL TECHNOLOGY (PROPRIETARY) LIMITED1 STURDEE AVENUE ROSENBANK GOTENG JOHANNESBURG 2196

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kramer, Luuk Laurentius Karmerik, NL 1 9
Terorde, Robert Johan Andreas Maria Maam, NL 6 56

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 23, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00