Device and method for the production of tubes or sections of tubes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8790231
APP PUB NO 20110301007A1
SERIAL NO

13151650

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device for the production of tubes or sections of tubes having at least one paper layer, from which paper bags can be manufactured, includes an unwinder device for unrolling at least one material web from a material web roll, a device for the provision of at least one edge region of each material web with glue, and a tube forming device via which the edge region provided with glue can be inverted onto, and attached to, a second edge region. The tubes or sections of tube can be provided with air-permeable channels in the device. The device for providing at least one edge area of each material web with glue has glue application valves, with at least two glue application valves being functionally assigned to each material web, and with noncontinuous glue tracks being produced with the glue application valves such that interruptions therein form the air-permeable channels.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WINDMOELLER & HOELSCHER KGMUENSTERSTRASSE 50 LENGERICH 49525

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lamkemeyer, Andreas Georgsmarienhuette, DE 9 10
Seeberger, Achim Lengerich, DE 4 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 29, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00