SYSTEM AND METHOD TO ESTIMATE THE EFFECTS OF RISKS ON THE TIME PROGRESSION OF PROJECTS

Number of patents in Portfolio can not be more than 2000

United States of America Patent

APP PUB NO 20110270644A1
SERIAL NO

13097913

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus (computer coupled to risk and planning data repositories) and method are provided which, upon finding well in advance possible delays of time references of end task or key milestone of a project (or interdependent projects) in life cycle, due to potential risks, calculate and output a set of values (coefficients matrix). These coefficients represent a two-way link between each risk and each milestone and their values estimate the contribution of a specific risk to a specific task/milestone. For each risk, it is possible to highlight the contribution of such risk to possible shift of the whole set of project tasks/milestones; at the same time, for each project task/milestone, the coefficients highlight the contribution of the whole set of risks to the time shift of such milestone/task. The coefficients values address more effectively reduction actions of the possible project/tasks delays. Similar results pare achieved for multi-interdependent-projects.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SELEX SISTEMI INTEGRATI S P AROMA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Manca, Roberto Rome, IT 1 81
Roncolato, Laura Rome, IT 1 81

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation