Method for Manufacturing Chalcopyrite Film
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
Aug 25, 2011
app pub date -
Feb 18, 2011
filing date -
Feb 19, 2010
priority date (Note) -
Abandoned
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A highly safe method of obtaining chalcopyrite film wherein a Ib group metal and IIIb group metal are sufficiently combined with a VIb group element by only heat treatment without using an atmosphere containing a VIb group element (Se, S, Te). heat treatment is performed in an inert atmosphere to combine the Ib group metal and IIIb group metal with the VIb group element.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
SUMITOMO METAL MINING CO LTD | 11-3 SHIMBASHI 5-CHOME MINATO-KU TOKYO 1058716 ?1058716 | |
THE RITSUMEIKAN TRUST | KYOTO 604-8415 |
International Classification(s)

- 2011 Application Filing Year
- H01L Class
- 19146 Applications Filed
- 15997 Patents Issued To-Date
- 83.56 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Minemoto, Takashi | Kusatsu-shi, JP | 6 | 27 |
# of filed Patents : 6 Total Citations : 27 | |||
Tsutsumi, Keiji | Kusatsu-shi, JP | 1 | 6 |
# of filed Patents : 1 Total Citations : 6 | |||
Yaginuma, Kiyoshi | Tokyo, JP | 1 | 6 |
# of filed Patents : 1 Total Citations : 6 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 6 Citation Count
- H01L Class
- 3.01 % this patent is cited more than
- 14 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
