Effective novel polymeric additive for inhibiting napthenic acid corrosion and method of using the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 10787619
APP PUB NO 20110160405A1
SERIAL NO

13061045

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to the field of inhibition of metal corrosion in hot acidic hydrocarbons, wherein acidity is derived from presence of naphthenic acid. More particularly, it relates to a polymeric additive for inhibiting high temperature napthenic acid corrosion, wherein said polymeric additive is polymeric phosphate ester of polyisobutylene succinate ester or oxide derivative of polymeric phosphate ester of polyisobutylene succinate ester. A polymeric phosphate ester of polyisobutylene succinate ester which is capable of acting as naphthenic acid corrosion inhibitor by inhibiting naphthenic acid corrosion in crude oil/feedstock/hydrocarbon streams containing naphthenic acid, and demonstrating higher thermal stability at elevated temperature varying from about 200° C. to about 400° C. [about 400° F. to about 750° F.] is disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DORF KETAL CHEMICALS (INDIA) PRIVATE LIMITED

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Subramaniyam, Mahesh Mumbai, IN 41 176

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 29, 2028
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 29, 2032
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00