METHOD FOR CONSTRUCTING AN UNDERGROUND TUNNEL OR HOLE TO CREATE AN IMPERVIOUS PLUG FOR THE STORAGE OF HAZARDOUS, PARTICULARLY RADIOACTIVE, WASTE

Number of patents in Portfolio can not be more than 2000

United States of America Patent

APP PUB NO 20110116868A1
SERIAL NO

13054243

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for the construction of a gallery or a shaft leading to an underground facility intended for the medium- or long-term storage of hazardous wastes, including an excavation of at least one determined length of the gallery carried out by using a method of prior preparation by protection or reinforcement of the materials prior to the excavation, in a part of the gallery intended to subsequently receive a plug that is sealed to liquids or gasses.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ECOLE POLYTECHNIQUEROUTE DE SACLAY PALAISEAU F-91120

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Habib, Pierre Paris, FR 9 52

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation