LITHIUM-ION SECONDARY BATTERY
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
N/A
Issued Date -
May 12, 2011
app pub date -
Jun 25, 2009
filing date -
Jun 25, 2008
priority date (Note) -
Abandoned
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
, and the separator is formed from a laminate composed of a porous layer containing resin having a melting point of 120° C. to 140° C., and a porous layer containing resin having a melting point of 150° C. or higher or a porous layer composed mainly of inorganic particles having a heat resistant temperature of 150° C. or higher.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
HITACHI MAXELL ENERGY LTD | 1 KOIZUMI OYAMAZAKI-CHO OTOKUNI-GUN KYOTO 618-8525 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Azuma, Hyo | Osaka, JP | 4 | 33 |
# of filed Patents : 4 Total Citations : 33 | |||
Kawabe, Keisuke | Osaka, JP | 12 | 80 |
# of filed Patents : 12 Total Citations : 80 | |||
Shibata, Shinsuke | Osaka, JP | 21 | 68 |
# of filed Patents : 21 Total Citations : 68 | |||
Tamakoshi, Hiromi | Osaka, JP | 3 | 21 |
# of filed Patents : 3 Total Citations : 21 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 17 Citation Count
- H01M Class
- 53.28 % this patent is cited more than
- 14 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
